Oil Exploration Managed With Three Shifts

2The crude oil exploration works will be managed with three shifts around the clock, every drilling is targeted to reach 3 thousand meters depth

The crude oil drilling works will be managed directed towards potential fields in the district of Kahta, southeastern province of Adıyaman, in Turkey. The teams will work with three shifts in 10 fields. The oil drilling works are being made in the district of Kahta where oil reservoirs are expected exist. Ten drilling fields with 40 employees at each field and on average 3 thousand meters depth is aimed to reach. A project has been prepared to expose crude oil at an area of some 7 thousand hectare

According to the information which takes in introductory file of the project, oil drilling works will be made within certificated area in 10 different points. According to the data which have been gained from the search and production wells, the potential areas have been determined where oil reservoir might be found. At the end of drilling works, clearer information will be obtained. The exploration activities are foreseen to be lasted during the certificated term.

In the case, the conducted drillings appear positive, the production wells would be planned to open, according to the statement.

The exploration works will be managed with three shifts around the clock. For every drilling is targeted to go up to 3 thousand meters depth. Nearly 40 persons will work at every drilling area.

Bir cevap yazın